
Service
Custom wooden kitchens in Mérida
Designed considering equipment, installations, hardware and the daily use of the space.
Design & fabrication
A kitchen is designed around daily use and building services
Before manufacturing a kitchen we need to know the real conditions of the space and the elements that will coexist with the carpentry. We review distribution, measurements, installations, location of equipment and appliances and opening systems. Resolving these points before entering the workshop reduces later adjustments and allows the furniture to function correctly in daily use.
Tap a photo to view it large
1 / 2
Workshop criteria
What we resolve before fabrication
Key technical decisions
Distribution and measurements considering building services, location of equipment and appliances and selection of hardware and opening systems.
Common mistake we avoid
Failing to consider water, gas, electricity outlets or the actual measurements of the equipment before manufacturing.
From quote to installation
How we run your project
01
Quotation
Using measurements or drawings, photographs and references we prepare a tailored proposal.
02
Site survey
We measure on site and check levels, plumb, services, access and possible clashes.
03
Design & samples
We develop the furniture drawings and physical finish samples for approval.
04
Fabrication
The design team follows the project and we review the pieces before moving them to site.
05
Installation & aftercare
We assemble, adjust and review on site. Afterwards we attend to details that require follow-up.
Other services
Round out the project
Articles
Keep reading
Before requesting a quote
Frequently asked questions about custom kitchens
Answers about design, materials, function and installation.
Available plans or measurements, photographs of the space and references help prepare the proposal. We also need to know equipment, materials, finishes and operating needs.
Yes. The measurements and location of the equipment are part of the decisions that must be reviewed before manufacturing so that the carpentry is integrated correctly.
We must consider the installations that affect the furniture, including water, gas and electricity outlets and their actual location within the project.
The selection depends on the use, type of opening, resistance, durability, comfort and budget. We make recommendations according to the needs of each project.
The finish is selected based on the use and conditions of the space. We can work with polyurethane finishes, oils or stains seeking resistance, protection and ease of maintenance.
As a reference, installing a kitchen can take approximately one or two weeks, depending on the project and the details that may arise on site.
Request a quote for your kitchen
Tell us what you need built. We can start with drawings or, if you don't have them yet, with reference images and approximate measurements.
